Gallery> All

Class b engineering bricks used to form a road manhole
Class b engineering bricks used to form a road manhole

More photographs on groundworks

Land marked and excavated
Building plot with kerbrace
100mm laid to form a rainwater gulley in a combined system
Dug out trench
Uncovered clay dig

Thumbnails

Health and safety requires scaffolding erected by a competent company
Drainage bridged with concrete lintel when passing through a footing wall
Class b engineering bricks used to form a road manhole
Foundation complete, ready for delivery and placing of block and beam floor
Block and beam floor awaiting 100mm concrete slab
Dry ridge pack used to roof of portico
Shell of porch extension completed and now ready for the door and window to be fitted
 
 
 
 
 
 
 
 
 
 
Page
14 of 14
 
 
 
 



 
Developed by: [To be inserted] - © 2009-2011